Skip to main content
Cranes over the expansion works at the Grand Mosque, Makkah

Continuous eyes on the site, physics on the structure, judgement in the office.

Computer vision for progress and safety, structural models to interpret sensor data, and specification reviews to catch ambiguity before it becomes a change order.

01Measured on site
Cameras measure progress and safety on site every week.
02Continuous monitoring
Structural models to interpret strain readings on the bridge, so inspection follows the condition of the structure.
03Specification checks
Procurement and coordination workflows to find contradictions in a four-hundred-page specification before work reaches site.

01Pain points

What we help solve

  1. 01

    Rework from late validation

    Design and coordination issues found on site, after the design is fixed.

  2. 02

    Safety by vigilance

    PPE non-compliance and unauthorised zone entry seen only when someone happens to look.

  3. 03

    Tenders that outlast the quotes

    Tender to award takes months, while supplier prices and availability change in weeks.

  4. 04

    Inspection by calendar

    Bridges and networks assessed on a schedule, with nothing measured between visits.

02Capabilities

Our work in the built environment

Continuous monitoring on the site, decision support in the office, and physics on the structure.

01
Vision on site

Continuous observation between site walks.

  • Progress tracking against the programme
  • PPE and safety-zone monitoring
  • Quality verification against design
  • One system across a multi-site programme
02
Project workflows

Ambiguity surfaced before it becomes a change order.

  • RFP and bid analysis with an engineer in the loop
  • Ambiguity detection in contracts and specifications
  • Workflow automation where a person is needed only for decisions
03
Asset monitoring

Structural condition known between inspections.

  • Structural health monitoring fusing sensor and visual data
  • Predictive maintenance for bridges, tunnels and transport assets
  • Condition-based intervention planning
  • Physics-based digital twins of the structure

03Questions

Questions we take on.

  • 01Is the programme on schedule, judging by what the cameras saw this week?

  • 02What is the strain on this bridge deck telling us, and does it change the inspection interval?

  • 03Which clauses in this four-hundred-page specification contradict each other?

Contact

Tell us your pain points.

Talk to us